Buoyancy protection against groundwater rise, GWS (Ground-Water Safe) is carried out with 2 UWR Connect modules (towers) for every 75 m² of surface area.
The UWR Connect towers (1) and (2) should be appropriately positioned in relation to the cleaning channels, preferably centered within the entire surface area of the basin.
UWR Connect tower 1 with GWS is closed on 3 sides with UWR Cover or UWR Connectring Closed against the other modules At the top, UWR CoverPipe 425 is installed for inspection, while the cover (UWR Cover) is omitted at the bottom.
UWR Connect tower (1) must have direct access to the subgrade, and the subgrade must be stable and follow the Road Directorate’s guidelines regarding loadbearing layers for road construction.
Under the basin, materials like geotextile can be laid out to direct water to UWR Connect tower 1.
The side facing the next UWR Connect tower (2) connects GWS with the two UWR Connect modules.